Email Address

Wednesday, October 23, 2013

Worldwide Development Corporation - Detail reasons why worldwide project is necessary for implementing new energy invention

Man-kinds survival depends on our ability to power the planet without fossil fuels


Common sense tells you fossil fuels is a limited resource and the world cannot depend on them for energy security long term.  We can argue over the time remaining before we run out of oil, but it is a limited resource and we run out of oil at some point in time in the future.  We can also agree we have created a modern society based on oil products such as plastics, etc..

World oil consumption rate is so large any oil discovery doesn't even put a dent in our energy outlook.

Potential oil discoveries in relationship to oil demand of 31 billion barrels per year:
1. Australia 300 billion bbls - 9 year demand
2. North Dakota 7.5 billion bbls - 3 month demand
3. Gulf of Mexico 48 billion bbls - 1 1/2 year demand

It doesn't make any difference how much oil we find we can't drill our way out of this problem.

Conversion from a carbon society to an alternative energy society worldwide is the most important and largest project that will ever be attempted by man-kind.  Man-kinds survival will actually depend on a successful outcome of this project.

This new energy invention I have created has the ability to power this planet many times over theoretically forever and I believe is the only possible solution to powering this planet without fossil fuels.  It has the ability to create an almost unlimited amount of electricity without any feed stocks distributed around the planet.

14% of energy including transportation is produced from alternative energy today and the only thing left to exploit is wind, solar, ocean current technology, wave technology, limited amount of geothermal which even as a group is minuscule compared to the future energy requirements of an additional 500 GW of electricity demand for the next 20 years.  Dams have already been exploited, Nuclear is taboo and finally the Inertial confinement projects have been totally a failure to-date.

So lets discuss the incredible amount of work it will take around the world to install this new energy invention.

Worldwide Major Project Requirements:

1. Prototype this new energy invention through a Manhattan type project in order to maximize the amount of energy produced and reduce the amount of maintenance required.

2. Setup technical centers around the world (at least 1 per continent and at U.N.)

Country Major Project Requirements:

1. Creation of Upstream Utility Energy Plan for every country worldwide
   A.  Energy needs for each country and particular geographical locations
         a. Current requirements
         b. Potential future requirements (include desalination plants, irrigation, etc.)
         c. Additional electrical requirements for alternative energy vehicles      
   B.  Potential new energy invention installation sites
         a. Energy potential for each site (1 Gw to 1 Tw of electricity potential)
         b. Transmission routes, backup, etc.
   C.  Establish priority criteria
         a.  Size of new energy invention implementation
         b.  Elimination of worst energy generation types (coal, diesel fuel, etc.)
         c.  Ability to implement new energy invention technologies (skills, etc.)
         d.  Most cost effective implementation sites (shortest transmission lines, etc.)
         e.  Largest needs for humanitarian requirements
         f.  Etc.
   D.  Identify countries where new energy invention isn't as effective (5% of planet)
         a. Determine what kind of alternative energy types make sense
         b. Determine if shipping lanes are available for liquid hydrogen similar to LNG
   E.  Each new energy implementation site has its own engineering challenges
        a.  Detail engineering of site preparation and any custom engineering required.

4. Completion of Downstream Utility Plan in preparation for current installation sites
   A. Required in preparation for new energy invention sites as they come online
   B. Upgrades required for additional electricity demands for transportation

This is just a small sample of all the projects that would be necessary to implement this new energy invention.

The Country Major Projects has to be completed in every country in the world to make the transformation from fossil fuels to alternative energy.


Technical Challenges:

1. Determine if hydrogen escaping in the atmosphere is hazardous
    a. We've never used hydrogen in the quantity reqd. for transportation vehicles
2. Design and engineer hydrogen and compressed air fueling stations
3. Design and engineer alternatives for all oil based motorized vehicles (autos, Trucks, lawn mowers, lawn edger's, chain saws, farm equipment, boats, airlines, trains, etc.)
4. Plan and develop implementation plans for all conversion necessary to eliminate carbon fuels

Imagine all the engineering, machine tooling, construction, etc. that would be required and the amount of time to transform our world to a sustainable planet for all future generations.  There are other major issues that are also necessary to fully create a sustainable planet for man-kind.  One example is setting up 360 recycling centers for everything as to not use more resources then necessary especially for things like plastics to eliminate the oil requirements in order to create a truly sustainable future.

Employment Requirements:

1. Implementation requirements would also require keeping the current environment going until such time as it can be completely replaced.
2. Transportation fueling will be the biggest challenge
3. Converting this planet would require an unbelievable amount of engineers, accountants, business leaders, construction workers, skill trades, tool and die, factory workers, etc. all around the world.
4. By starting a worldwide project unemployment would be a thing of the past and young people all around the world would have a future to look forward to just like our forefathers did for us by developing the super highway system, etc..

Monetary Policy:

1. Current monetary policy around the world would either make it extremely difficult or even impossible to create a worldwide project to implement this new energy invention.
2. Sixty percent of the wealth in United States is owned by less than 1% of the people in the U.S. and Europe is even in worse shape when it comes to inequities. These people want a return for their money and believe anything that doesn't directly benefit them is not worth investing in, which makes this type of project completely impossible in western countries today around the world.
3. It's necessary for governments around the world to step in and create a worldwide currency that funds this project for the benefit and survival of man-kind.

People that read this blog must ask yourself is your children and grandchildren worth the huge amount of efforts required in order to save this planet and man-kind.  The Alternative is billions of deaths around the world and possibly the destruction of man-kind from wars, starvation, etc. due to lack of energy resources.

Powering the Planet - Current Status




Powering the Planet - A Universal Appeal





No comments: